Overview:
A pharmaceutical company in France installed a new chilled water system at one of its plants. As part of the installation, a pipe rack was required to arrange the utility pipelines and cables between the equipment and a building. The hot-tip galvanized steel rack was subcontracted to our group and was about 20m long, 8.5m high and was fixed to the ground at two points.
Software Used:
Scope of project:
The design and engineering analysis was carried out by EFM Design Services while the structure was fabricated and erected by our European partner, Greening Services.
Deliverables by EFM: